Granted
Boulevard du Triomphe 175
Auderghem · PU/674333 · Permis d'urbanisme privé
Boulevard du Triomphe 175, Auderghem: new construction. Case octroyé, lodged on 6 November 1987. The decision was notified on 6 November 1987, 0 days after lodging.
construction d'immeuble a usage d'entreprise a caractère urbain (pas de geolocalisation possible)| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 6 November 1987 | date the file was received |
| Decision notified | 6 November 1987 | 0 days |
| Floor areas | — | not reported by the source |
| Competent authority | Auderghem |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 25 m | Demolition and reconstruction | Reconvertir 2 immeubles (n°173-174) monofonctionnels d’une superficie totale de 11 976 m² de bureau : Démolir l’immeuble | 2026 |
| 28 m | Demolition and reconstruction | Démolir un immeuble de bureau (4338 m²) et construire un immeuble mixte comprenant cent-quatorze unités de logement (14 | 2026 |
| 28 m | Demolition and reconstruction | Démolir un immeuble de bureau (4338 m²) et construire un immeuble mixte comprenant 114 unités de logement (14 406m²), 2 | 2024 |
| 102 m | Tree felling | mise en conformité, suite à un arrêté du Bourgmestre, de l'abattage d'un arbre à haute tige: saule blanc (Salix alba) | 2023 |
| 147 m | Signs and advertising | maintenir un écran digital de communication de 6 m². | 2023 |
Other nearby cases : 09/PFD/1908353, 02/PP/1974678, 09/LPFD/1917130, 09/AA/1938353, 02/PFD/1801350, 02/PFD/1891699, 02/PU/1811617, 02/PFD/2013674, 09/AA/1923477, 09/AA/1923566, 02/PP/1911168, 02/PFD/1982885, 02/PFD/1895334, 02/PFD/1908720, 02/PU/1924562, 02/ENS/1853063, 02/PFD/1911074
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)