Skip to content
AltUrb
Granted

Boulevard de l'Humanité 126

Forest · PU/702513 · Permis d'urbanisme privé

Boulevard de l'Humanité 126, Forest: other. Case octroyé, lodged on 18 October 2018. The decision was notified on 26 November 2019, 404 days after lodging.

Modifier le PU26103.
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme privé
StatusOctroyé
Lodged on18 October 2018date the file was received
Decision notified26 November 2019404 days
Competent authorityForest

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted
  5. event_works_ended

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
97 mSigns and advertisingInstaller un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel 2023
145 mSigns and advertisingMaintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116.2024
177 mExtension or raisingconstruire une extension d'un entrepôt2022
195 mHeavy renovationtransformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé2023
224 mNew constructionconstruire un hall industriel et des locaux d'activités productives2024

Other nearby cases : 01/PU/1908338, 01/PFD/1952064, 01/PU/1938453

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)