Avenue Notre-Dame 40
1140 Evere
10 permit cases concern Avenue Notre-Dame 40 since 1995: 4 granted, 0 refused and 4 pending. Cases are listed newest first.
| Records in total | 10 | |
|---|---|---|
| First case | 1995-08-03 | |
| Latest case | 2024-08-19 | |
| Granted | 4 | |
| Refused | 0 |
The cases, newest first
| Date | Reference | Work type | Outcome | Object |
|---|---|---|---|---|
| 2024-08-19 | 06/PFD/1954411 | Demolition and reconstruction | Granted | Démolir et construire un nouveau pavillon sanitaire sous un auvent existant pour l' école élémentaire Clair-Vivre. |
| 2016-07-25 | 06/PFD/606622 | Façade and windows | Granted | Poser un panneau acoustique en façade à rue avenue notre- Dame . |
| 2015-05-06 | 06/PFD/563368 | Demolition and reconstruction | Granted | PERMIS ECOLE: Démolir et reconstruire 4 classes |
| 2009-10-08 | 06/PFD/270398 | Façade and windows | Pending | Remplacer les châssis de l'école Clair-Vivre. |
| 2007-08-08 | C_TMP/451458 | — | Withdrawn | |
| 2007-06-26 | PU/244149 | Demolition | Pending | démolir un pavillon scolaire (école Clair-Vivre) |
| 2007-06-26 | 06/PFD/183291 | Demolition | Granted | Démolir un pavillon scolaire de 2 classes à l'école Clair-Vivre et transformer la superficie démolie en pelouse pour espace de récréation |
| 1999-08-16 | C_TMP/420929 | — | Withdrawn | |
| 1995-08-03 | 06/PFD/91716-01 | Demolition and reconstruction | Pending | démolir l'ensemble du pavillon 6 (Ossatub) de l'école Clair-Vivre et construction de 2 locaux de classes |
| — | PU/242454 | Demolition and reconstruction | Pending | démolir l'ensemble du pavillon 6 de l'école Clair-Vivre et construire 2 locaux de classes |
This street carries 271 cases in Evere, across every address.
A case belongs to this address when the source records the same number, street and commune. Works carried out without a permit, or exempt from one, do not appear here.
Avenue Notre-Dame 40, Evere · Onze Lieve Vrouwlaan 40, Evere
