Granted
Boulevard de l'Humanité 114
Anderlecht · 01/CL2/1728960 · Permis d'environnement communal Classe 2
Boulevard de l'Humanité 114, Anderlecht: operation of installations. Case octroyé, lodged on 15 October 2019. The decision was notified on 9 October 2020, 360 days after lodging.
continuer à exploiter un bâtiment de bureaux comprenant des emplacements de stationnement, une chaudière et un système de climatisation| Permit type | Permis d'environnement communal Classe 2 | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 15 October 2019 | date the file was received |
| Public inquiry | 27 August 2020 – 11 September 2020 | |
| Decision notified | 9 October 2020 | 360 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 69 m | Signs and advertising | maintenir un dispositif publicitaire de 15m² | 2025 |
| 77 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
| 140 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 162 m | Change of use | changer l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room | 2023 |
| 183 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
Other nearby cases : 01/PU/1942080, 01/SFD/1979420, 07/PU/1960081, 07/SFD/1840383, 07/PU/1834972, 07/PU/1826265, 01/PU/1904139
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)