Skip to content
AltUrb
Withdrawn

Boulevard Industriel 125

Anderlecht · 01/IPE/457870 · Permis d'environnement

Boulevard Industriel 125, Anderlecht: operation of installations. Case annulé, lodged on 7 February 2011. The decision was notified on 8 April 2011, 60 days after lodging.

Implantation d'un parking temporaire destiné au concessionnaire " Martin Motors " suite à la perte de 15 emplacements de parking lors des travaux réalisés par Infrabel sur la ligne de chemin de fer 50A comprenant 15 emplacements de parking à l'air libre (152A)
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on7 February 2011date the file was received
Decision notified8 April 201160 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared complete
  3. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
58 mSigns and advertisingMaintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116.2024
72 mChange of usechanger l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room2023
80 mSigns and advertisingInstaller un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel 2023
152 mSigns and advertisingmaintenir un dispositif publicitaire de 15m²2025
184 mSigns and advertisingmaintenir un dispoisitif publicitaire de 36 m²2025

Other nearby cases : 01/PU/1831604, 01/PU/1942080, 01/SFD/1979420, 01/PU/1904139, 01/PU/1931349

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)