Withdrawn
Boulevard Industriel 200
Anderlecht · 01/IPEEXT/1715146 · Extension / Transformation de PE
Boulevard Industriel 200, Anderlecht: energy works. Case annulé, lodged on 4 June 2019. The decision was notified on 3 July 2019, 29 days after lodging.
Ajout d’un groupe électrogène et sa citerne (régularisation).| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 4 June 2019 | date the file was received |
| Decision notified | 3 July 2019 | 29 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Roof | Rénover, isoler la toiture et installer un garde-corps pour la sécurité de l’équipe d’entretien de la toiture et de ses | 2024 |
| 73 m | Change of use | Modifier une partie du complexe industriel en un commerce HORECA | 2022 |
| 151 m | Demolition | Démolition d'un appentis adjacent à des hangars existant. | 2025 |
| 154 m | Other | Mettre en conformité l'installation d'une clôture et utiliser un terrain pour stocker des conteneurs vides | 2022 |
| 162 m | Change of use | Mettre en conformité la construction d'un volume central et la réalisation d'emplacements de stationnement et modifier l | 2022 |
Other nearby cases : 07/SFD/1840228, 07/PU/2003993, 07/PFD/2003755, 07/PU/2031702, 01/PU/1940247, 01/GOU_PU/1904298, 01/PU/1857826
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)