Skip to content
AltUrb
Withdrawn

Boulevard Industriel 200

Anderlecht · 01/IPEEXT/1715146 · Extension / Transformation de PE

Boulevard Industriel 200, Anderlecht: energy works. Case annulé, lodged on 4 June 2019. The decision was notified on 3 July 2019, 29 days after lodging.

Ajout d’un groupe électrogène et sa citerne (régularisation).
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on4 June 2019date the file was received
Decision notified3 July 201929 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mRoofRénover, isoler la toiture et installer un garde-corps pour la sécurité de l’équipe d’entretien de la toiture et de ses 2024
73 mChange of useModifier une partie du complexe industriel en un commerce HORECA2022
151 mDemolitionDémolition d'un appentis adjacent à des hangars existant.2025
154 mOtherMettre en conformité l'installation d'une clôture et utiliser un terrain pour stocker des conteneurs vides2022
162 mChange of useMettre en conformité la construction d'un volume central et la réalisation d'emplacements de stationnement et modifier l2022

Other nearby cases : 07/SFD/1840228, 07/PU/2003993, 07/PFD/2003755, 07/PU/2031702, 01/PU/1940247, 01/GOU_PU/1904298, 01/PU/1857826

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)