Skip to content
AltUrb
Withdrawn

Boulevard Industriel 198

Anderlecht · 01/IPEEXT/456309 · Extension / Transformation de PE

Boulevard Industriel 198, Anderlecht: operation of installations. Case annulé, lodged on 12 February 2010. The decision was notified on 12 March 2010, 28 days after lodging.

extension = adaptation mineure des bâtiments et des abords lors des travaux de réalisation. Pas de modification substentielle du parking à l'air libre (tjrs 78 emplacements) pas d'impact point de vue du PE d'ou prise d'acte
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on12 February 2010date the file was received
Decision notified12 March 201028 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
59 mSigns and advertisingmaintenir un dispositif publicitaire existant2024
150 mDemolition and reconstructiondémolir les bâtiments existants afin d'agrandir le refuge pour animaux2024
150 mDemolitiondémolir les bâtiments existants afin d'agrandir le refuge pour animaux2024
173 mRoofRénover, isoler la toiture et installer un garde-corps pour la sécurité de l’équipe d’entretien de la toiture et de ses 2024
218 mSigns and advertisingmettre en conformité le maintien d'un dispositif publicitaire de type 8m²2023

Other nearby cases : 01/PU/1857826, 07/PU/1860135

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)