Skip to content
AltUrb
Granted

Boulevard Industriel 198

Anderlecht · 01/IPEPLP/1860258 · Prolongation de PE

Boulevard Industriel 198, Anderlecht: operation of installations. Case octroyé, lodged on 28 October 2022. The decision was notified on 24 November 2023, 392 days after lodging.

Prolongation d’un dépôt et showroom de matériel sanitaire
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on28 October 2022date the file was received
Decision notified24 November 2023392 days
Works started1 December 2023
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted
  5. Works started

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
59 mSigns and advertisingmaintenir un dispositif publicitaire existant2024
150 mDemolition and reconstructiondémolir les bâtiments existants afin d'agrandir le refuge pour animaux2024
150 mDemolitiondémolir les bâtiments existants afin d'agrandir le refuge pour animaux2024
173 mRoofRénover, isoler la toiture et installer un garde-corps pour la sécurité de l’équipe d’entretien de la toiture et de ses 2024
218 mSigns and advertisingmettre en conformité le maintien d'un dispositif publicitaire de type 8m²2023

Other nearby cases : 01/PU/1857826, 07/PU/1860135

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)