Withdrawn
Boulevard Industriel 125
Anderlecht · 01/IPEPLP/1973627 · Prolongation de PE
Boulevard Industriel 125, Anderlecht: operation of installations. Case annulé, lodged on 13 February 2025. The decision was notified on 17 February 2026, 369 days after lodging.
Prolongation du permis environment d'une garage automobile| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 13 February 2025 | date the file was received |
| Decision notified | 17 February 2026 | 369 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 58 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 72 m | Change of use | changer l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room | 2023 |
| 80 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 152 m | Signs and advertising | maintenir un dispositif publicitaire de 15m² | 2025 |
| 184 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
Other nearby cases : 01/PU/1831604, 01/PU/1942080, 01/SFD/1979420, 01/PU/1904139, 01/PU/1931349
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)