Granted
Rue des Deux Gares 128
Anderlecht · 01/IPEPLP/487655 · Prolongation de PE
Rue des Deux Gares 128, Anderlecht: operation of installations. Case octroyé, lodged on 23 May 2013. The decision was notified on 27 May 2014, 369 days after lodging.
Verlenging milieuvergunning| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 23 May 2013 | date the file was received |
| Decision notified | 27 May 2014 | 369 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Change of use | Changer l’affectation de locaux de formation en laboratoire de matériaux et construire un local de stockage. | 2023 |
| 155 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 36m², situé sur un talus à proximité de la Rue de la Petite-Île n° 128. | 2024 |
| 200 m | Student housing | Démolir un hangar commercial et construire un immeuble comprenant 306 logements étudiants (176 studios conventionnées et | 2025 |
| 209 m | New construction | demande initiale :aménager un nouveau quartier 'Petite-île/ Citygate II' comportant 254 logements sociaux, 109 logements | 2021 |
| 210 m | Public space | Apporter une modification mineure à un îlot de circulation existant dans la Rue des Deux Gares, afin de permettre un acc | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
