Skip to content
AltUrb
Granted

Boulevard du Triomphe 211

Auderghem · 02/IPE/474753 · Permis d'environnement

Boulevard du Triomphe 211, Auderghem: operation of installations. Case octroyé, lodged on 30 August 2012. The decision was notified on 26 April 2013, 239 days after lodging.

BX-L161-026
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusOctroyé
Lodged on30 August 2012date the file was received
Public inquiry18 March 2013 – 2 April 2013
Decision notified26 April 2013239 days
Works started25 April 2013
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Works started
  7. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
147 mSigns and advertisinginstaller 2 enseignes-bannières à l'avant du bâtiment les Orangeries (maison de repos) NDL2021
147 mMerger of dwellingsmodifier le permis 15365 ainsi que remplacer 3 kots par une conciergerie, remplacer des tôles métalliques au rez-de-chau2025
226 mRoofrégulariser une lucarne (régularisation simplifiée art. 330§3 du CoBAT) 2025
245 mExtension or raisingrégulariser la situation existante de fait des constructions (+ véranda + modifications en façade avant)2021
247 mHeavy renovationtransformer le rez-de-chaussée de l'habitation2025

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)