Granted
Boulevard du Triomphe 175–214
Auderghem · 02/IPE/589505 · Permis d'environnement
Boulevard du Triomphe 175–214, Auderghem: —. Case octroyé, lodged on 6 January 2016. The decision was notified on 4 January 2017, 364 days after lodging.
| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 6 January 2016 | date the file was received |
| Public inquiry | 1 September 2016 – 16 September 2016 | |
| Consultation committee | 29 September 2016 | |
| Decision notified | 4 January 2017 | 364 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 48 m | Signs and advertising | installer 2 enseignes-bannières à l'avant du bâtiment les Orangeries (maison de repos) NDL | 2021 |
| 48 m | Merger of dwellings | modifier le permis 15365 ainsi que remplacer 3 kots par une conciergerie, remplacer des tôles métalliques au rez-de-chau | 2025 |
| 188 m | Energy works | mettre en conformité la modification des emplacement de stationnement pour vélos et pour voiture et modifier les install | 2026 |
| 189 m | Energy works | placer deux pompes à chaleur sur la toiture de deux bâtiments de bureaux et d’activité productive | 2022 |
| 189 m | Public space | réaménager les abords (placement de bancs, création de nouveaux emplacements de stationnement pour véhicules automobiles | 2022 |
Other nearby cases : 09/AA/1923566, 09/AA/1923477, 09/AA/1938353
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)