Granted
Boulevard du Triomphe 175–214
Auderghem · 02/IPEEXT/1720859 · Extension / Transformation de PE
Boulevard du Triomphe 175–214, Auderghem: operation of installations. Case octroyé, lodged on 24 July 2019. The decision was notified on 21 August 2019, 28 days after lodging.
modification : adaptation de la liste des installations classées suite à la mise en exploitation du site| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 24 July 2019 | date the file was received |
| Decision notified | 21 August 2019 | 28 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 169 m | Demolition and reconstruction | Reconvertir 2 immeubles (n°173-174) monofonctionnels d’une superficie totale de 11 976 m² de bureau : Démolir l’immeuble | 2026 |
| 175 m | Signs and advertising | installer 2 enseignes-bannières à l'avant du bâtiment les Orangeries (maison de repos) NDL | 2021 |
| 175 m | Merger of dwellings | modifier le permis 15365 ainsi que remplacer 3 kots par une conciergerie, remplacer des tôles métalliques au rez-de-chau | 2025 |
| 189 m | Tree felling | mise en conformité, suite à un arrêté du Bourgmestre, de l'abattage de 17 arbres à haute tige | 2023 |
| 195 m | Tree felling | abattre 7 arbres à haute tige: 5 saules marsaults (dont deux morts) et 2 pins noirs (morts) | 2023 |
Other nearby cases : 09/AA/1938353, 02/PFD/1935557, 02/GOU_PU/2043076, 09/LPFD/1917130, 02/PFD/1891699
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)