Skip to content
AltUrb
Granted

Boulevard du Triomphe 175–214

Auderghem · 02/PFD/588197 · Permis d'urbanisme délivré par le FD

Boulevard du Triomphe 175–214, Auderghem: new construction. Case octroyé, lodged on 18 December 2015. The decision was notified on 3 February 2017, 413 days after lodging. The project creates 10 830 m² of housing. It comprises 209 dwellings.

Construire un complexe comprenant 209 appartements, 102 chambres étudiants, une maison de repos et de soin de 150 lits, des commerce (1197m²), modifier le parking en infrastructure (+195 emplacements) et ajouter une voirie de jonction vers l'E411 (modification du permis d'urbanisme délivré le 22/10/2013)
The application's own description, in its source language (FR). Source: Nova.
10 830
Housing floor area created
209
Dwellings created
Key figures
Permit typePermis d'urbanisme délivré par le FD
StatusOctroyé
Lodged on18 December 2015date the file was received
Public inquiry1 September 2016 – 16 September 2016
Consultation committee29 September 2016
Decision notified3 February 2017413 days
Competent authorityBUP

Timeline

  1. Application lodged
  2. Declared complete
  3. Public inquiry opened
  4. Public inquiry closed
  5. Consultation committee
  6. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
145 mSigns and advertisinginstaller 2 enseignes-bannières à l'avant du bâtiment les Orangeries (maison de repos) NDL2021
145 mMerger of dwellingsmodifier le permis 15365 ainsi que remplacer 3 kots par une conciergerie, remplacer des tôles métalliques au rez-de-chau2025
248 mDemolition and reconstructionReconvertir 2 immeubles (n°173-174) monofonctionnels d’une superficie totale de 11 976 m² de bureau : Démolir l’immeuble2026

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)