Skip to content
Altaica Urban
Granted

Anna Boch drève

Bruxelles · 04/CL3/1976021 · Déclaration préalable Communal

Anna Boch drève, Bruxelles: new construction. Case octroyé, lodged on 4 March 2025.

Bouwwerf voor de constructie van een nieuwbouw gebouw
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeDéclaration préalable Communal
StatusOctroyé
Lodged on4 March 2025date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mNew constructionLa présente demande concerne une modification du permis déjà obtenu pour la construction du Stadsatelier de Ville, sous 2025
0 mNew constructionConstruire un nouveau "Stadsatelier de Ville" sur le site de Tour et Taxis à Bruxelles.2024
129 mPublic spaceConstruire une nouvelle voirie de circulation entre le parc Tour & Taxis et la rue Dieudonné Lefèvre. Aménager une voiri2026
138 mNew constructionModifier le permis d'urbanisme délivré le 17/12/2009 (permis modificatif du permis initial : 04/AFD/189309) : - Urbanise2023
203 mChange of useCréation d'un dépôt de patrimoine pour la Maison du Pain, Musée de la Mode et de la Dentelle avec l'ajout d'ouvertures e2022

Other nearby cases : 04/PFD/1987350

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)