Skip to content
AltUrb
Granted

Quai de Heembeek 9

Bruxelles · 04/IPEEXT/2017545 · Extension / Transformation de PE

Quai de Heembeek 9, Bruxelles: operation of installations. Case octroyé, lodged on 22 January 2026. The decision was notified on 20 February 2026, 29 days after lodging.

Ajout de la rubrique 132B - ajout d'une PAC
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusOctroyé
Lodged on22 January 2026date the file was received
Decision notified20 February 202629 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mEnergy worksInstaller une pompe à chaleur au sol2026
71 mNew constructionplacer un local prefab et installer une terras en bois2023
233 mNew constructionConstruire un nouveau projet mixte immobilier et paysager comprenant : - une école secondaire d'une capacité d'accueil d2023
236 mPublic spaceCréer un passage cyclo-piéton et réaménager l’espace public au débouché de celui-ci le long de la rive gauche du canal, 2021
245 mDemolition and reconstructionDémolir 2 hangars existants pour reconstruire un magasin de vente de matériaux avec un espace d'entreposage à l'étage ai2023

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)