Granted
Boulevard Simon Bolivar 34
Bruxelles · 04/IPEEXT/2030169 · Extension / Transformation de PE
Boulevard Simon Bolivar 34, Bruxelles: operation of installations. Case octroyé, lodged on 30 April 2026. The decision was notified on 29 May 2026, 29 days after lodging.
Modif. permis env. (PLP/1A/2020/1770568) : MAJ et ajout d'installations classées, suite aux visites, avis SIAMU et recommandations inspectorat (2 bâtiments).| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 30 April 2026 | date the file was received |
| Decision notified | 29 May 2026 | 29 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 80 m | Heavy renovation | apporter des modifications lourdes avec modifications de volume à un immeuble de bureau | 2025 |
| 131 m | New construction | Construire une crèche néerlandophone en préfabriqué pour 30 enfants (permis à durée limitée) | 2025 |
| 133 m | Façade and windows | Modifier les châssis de l'entrée principale de la tour WTC III | 2022 |
| 146 m | New construction | Demande initiale : Construire sur une partie du site formé par l'actuel immeuble WTC III, après démolition partielle du | 2022 |
| 146 m | New construction | renouveler, pour une durée maximale de 4 ans, l’installation de 13 conteneurs préfabriqués, d’une terrasse et d’une zone | 2023 |
Other nearby cases : 04/PFD/1932022, 04/PFD/1833092, 04/PFD/2020155, 04/PFD/1998434, 04/PFD/1822391, 04/PFD/2019649, 04/GOU_PU/2033319, 04/PU/2035010, 04/PU/1832245
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
