Skip to content
Altaica Urban
Granted

Quai de Heembeek 9–9A

Bruxelles · 04/IPEPLP/1743868 · Prolongation de PE

Quai de Heembeek 9–9A, Bruxelles: operation of installations. Case octroyé, lodged on 2 March 2020. The decision was notified on 1 September 2021, 548 days after lodging.

Exploitation d'un atelier d'entretien, de réparation et de peinture de véhicules
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on2 March 2020date the file was received
Decision notified1 September 2021548 days
Works started4 September 2021
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted
  5. Works started

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
93 mNew constructionplacer un local prefab et installer une terras en bois2023
113 mDemolition and reconstructionDémolir 2 hangars existants pour reconstruire un magasin de vente de matériaux avec un espace d'entreposage à l'étage ai2023
131 mEnergy worksInstaller une pompe à chaleur au sol2026
181 mNew constructionConstruire 125 logements, 7 locaux destinés à des commerces et à des activités de production, créer un parking souterrai2026
204 mHeavy renovationmodifier un bâtiment destiné au commerce de gros2022

Other nearby cases : 04/PU/1856856, 04/PU/1908901, 04/PFD/1811459, 04/PU/1898890, 04/PFD/1902432

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)