Skip to content
Altaica Urban
Pending

Quai des Usines 22

Bruxelles · 04/IPEPLP/2002193 · Prolongation de PE

Quai des Usines 22, Bruxelles: operation of installations. Case demandé, lodged on 19 September 2025.

Prolongation permis d'environnement
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusDemandé
Lodged on19 September 2025date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
1 mNew constructionConstruction un nouveau local cabine haute tension sur le site MaBru2025
1 mNew constructionConstruire un nouveau local cabine haute tension sur le site MaBru2025
2 mChange of useaménager la mezzanine du Hall E et une partie du Hall D en espace polyvalent pour événements2022
2 mSigns and advertisingrenouveler le PU U1352/2016 pour le maintien sur terrains non-bâtis, de deux dispositifs publicitaires monopied double-f2022
2 mNew constructionconstruire un entrepôt pour le commerce de gros avec bureau accessoire entraînant la suppression de 18 places de parking2022

Other nearby cases : 04/PU/1908267, 04/PU/1847186, 04/PU/1917423, 04/PU/1925823, 04/PFD/1910014, 04/PFD/1825881, 04/PU/1859261

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)