Withdrawn
Quai de Heembeek 9–9A
Bruxelles · 04/IPEPLP/446604 · Prolongation de PE
Quai de Heembeek 9–9A, Bruxelles: operation of installations. Case annulé, lodged on 26 July 2005. The decision was notified on 13 November 2006, 475 days after lodging.
Exploitation d'un atelier d'entretien, de réparation et de peinture de véhicules| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 26 July 2005 | date the file was received |
| Decision notified | 13 November 2006 | 475 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Demolition and reconstruction | Démolir 2 hangars existants pour reconstruire un magasin de vente de matériaux avec un espace d'entreposage à l'étage ai | 2023 |
| 163 m | Heavy renovation | modifier un bâtiment destiné au commerce de gros | 2022 |
| 172 m | Extension or raising | construire un auvent pour abriter 9 bus touristiques, aménager des bureaux accessoires au commerce | 2023 |
| 173 m | New construction | Construire 125 logements, 7 locaux destinés à des commerces et à des activités de production, créer un parking souterrai | 2026 |
| 198 m | New construction | placer un local prefab et installer une terras en bois | 2023 |
Other nearby cases : 04/PFD/2017216