Skip to content
AltUrb
Granted

Tunnel SNCB Merode

Etterbeek · 05/IPEDEC/1696117 · Déclaration préalable

Tunnel SNCB Merode, Etterbeek: operation of installations. Case octroyé, lodged on 4 December 2018.

034B5_1, 02TMM_01, BX3827
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeDéclaration préalable
StatusOctroyé
Lodged on4 December 2018date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
46 mHeavy renovationrénover une maison unifamiliale, placer une verrière et une terrasse en toiture, ainsi que transformer les façades arriè2021
47 mFaçade and windowsModifier la teinte des bétons sur les façades rue ( remise en couleur original, à la date de la construction)2024
94 mOtherInstaller une clôture anti-escalade de 3 mètres de hauteur sur environ 750 mètres de long, ainsi que trois portails d'ac2025
94 mDemolition and reconstructionDémolir un immeuble de bureaux situé au Cours Saint-Michel; construire la nouvelle l'ambassade des États-Unis d'Amérique2025
102 mRoofrégulariser, en application de l'article 330§3 du CoBAT, l'aménagement d'une terrasse sur une toiture plate au rez arriè2024

Other nearby cases : 05/PU/1849498, 05/AA/1922529, 05/PU/1905205, 05/PU/1938563, 05/PU/2040466, 05/PU/1848575, 05/PU/2026966, 05/PU/1930951, 05/PU/1932607, 05/PU/1847221, 05/PU/1848595, 05/PU/1974320, 05/PU/2041005, 05/PU/1959848, 05/PU/2036115, 05/PU/1957041, 05/PU/1907169, 05/PU/1916830, 05/PFD/1941911, 05/PU/1946185, 05/PU/1984037, 05/PU/1942665, 05/PU/1823803, 05/PU/1978200, 05/PU/2002782

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)