Withdrawn
Rue Bollinckx 319–325
Forest · 07/IPE/453601 · Permis d'environnement
Rue Bollinckx 319–325, Forest: operation of installations. Case annulé, lodged on 5 November 2008. The decision was notified on 10 May 2010, 551 days after lodging.
ic ok - renouvellement de pe pour une station d'épuration des eaux résiduaires urbaines STEP Sud| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 5 November 2008 | date the file was received |
| Decision notified | 10 May 2010 | 551 days |
| Floor areas | — | not applicable to this type of case |
| Impact study | yes |
Timeline
- Application lodged
- Declared complete
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 86 m | Demolition | Démolition d'un appentis adjacent à des hangars existant. | 2025 |
| 138 m | Other | Mettre en conformité l'installation d'une clôture et utiliser un terrain pour stocker des conteneurs vides | 2022 |
| 140 m | Change of use | Modifier une partie du complexe industriel en un commerce HORECA | 2022 |
| 156 m | Change of use | Régulariser partiellement le permis d’urbanisme existant, portant sur l’utilisation d’une zone de stockage dans le cadre | 2025 |
| 156 m | Change of use | Mettre en conformité la construction d'un volume central et la réalisation d'emplacements de stationnement et modifier l | 2022 |
Other nearby cases : 07/SFD/1840228, 07/PU/2003993, 07/PU/2031702, 01/PFD/1935550
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)