Granted
Boulevard de la Plaine
Ixelles · 09/PU/1945769 · Permis d'urbanisme privé
Boulevard de la Plaine, Ixelles: new construction. Case octroyé, lodged on 3 September 1972. The decision was notified on 1 November 1974, 789 days after lodging.
construction d’un immeuble à usage de laboratoire| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 3 September 1972 | date the file was received |
| Decision notified | 1 November 1974 | 789 days |
| Floor areas | — | not reported by the source |
| Competent authority | Ixelles |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 49 m | New construction | Installer une structure temporaire comprenant un auditorium de 500 places (2 x 250 places), des toilettes et des instal | 2022 |
| 140 m | New construction | Construire un nouvel escalier de secours pour le bâtiment universitaire BC sur le campus de la Plaine | 2026 |
| 140 m | Extension or raising | Construction d’un nouvel escalier de secours pour le bâtiment BC aile C, au campus de la Plaine à Ixelles, dans le but d | 2026 |
| 154 m | Tree felling | abattre 4 arbres à haute tige: 2 saules blancs (Salix alba), 1 tilleul argenté (Tilia tomentosa), et 1 érable rouge (Ace | 2025 |
| 231 m | Façade and windows | isoler par l'extérieur 2 façades et une partie du mur mitoyen | 2023 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)