Avenue Emmanuel Mounier 50, Woluwe-Saint-Lambert: operation of installations. Case octroyé, lodged on 8 January 2020. The decision was notified on 3 February 2020, 26 days after lodging.
Ajout des IC du permis n°256663 au PE 697992 + ajout d’un labo OGM.| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 8 January 2020 | date the file was received |
| Decision notified | 3 February 2020 | 26 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 85 m | Heavy renovation | modifier le permis 18/PFD/1753988 concernant la mise en place d’un learning center de l’UCL, placer des garde-corps fixe | 2023 |
| 85 m | Change of use | changer l'affectation d'un local semi-enterré de cave en commerce alimentaire BIO de proximité et mettre en place des en | 2023 |
| 102 m | Tree felling | Demande de permis pour abattre un arbre mort et plantation de nouveaux arbres | 2025 |
| 110 m | Façade and windows | Remplacer les menuiseries extérieures et les stores solaires du bâtiment "Galien" sur le site de l'UCLouvain | 2022 |
| 148 m | Signs and advertising | Placer, déplacer, adapter, régulariser des caméras de surveillance du site Proposer un modèl unique pour l'ensemble du | 2021 |