Granted
Boulevard Industriel 198
Anderlecht · PU/335007 · Permis d'urbanisme privé
Boulevard Industriel 198, Anderlecht: change of use. Case octroyé, lodged on 24 July 2007. The decision was notified on 10 June 2008, 322 days after lodging.
transformation dun hall de stockage en dépôt professionnel et grand commerce spécialisé| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 24 July 2007 | date the file was received |
| Public inquiry | 26 September 2007 – 11 October 2007 | |
| Consultation committee | 24 October 2007 | |
| Decision notified | 10 June 2008 | 322 days |
| Floor areas | — | not reported by the source |
| Competent authority | Anderlecht |
Timeline
- Application lodged
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 59 m | Signs and advertising | maintenir un dispositif publicitaire existant | 2024 |
| 150 m | Demolition and reconstruction | démolir les bâtiments existants afin d'agrandir le refuge pour animaux | 2024 |
| 150 m | Demolition | démolir les bâtiments existants afin d'agrandir le refuge pour animaux | 2024 |
| 173 m | Roof | Rénover, isoler la toiture et installer un garde-corps pour la sécurité de l’équipe d’entretien de la toiture et de ses | 2024 |
| 218 m | Signs and advertising | mettre en conformité le maintien d'un dispositif publicitaire de type 8m² | 2023 |
Other nearby cases : 01/PU/1857826, 07/PU/1860135