Granted
Boulevard du Triomphe 175–214
Auderghem · PU/480064 · Permis d'urbanisme privé
Boulevard du Triomphe 175–214, Auderghem: other. Case octroyé, lodged on 28 November 2012. The decision was notified on 11 February 2013, 75 days after lodging.
réaliser des travaux d'infrastructure, de terrassement et d'assainissement du terrain avec modification du relief et abattage d'arbres| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 28 November 2012 | date the file was received |
| Decision notified | 11 February 2013 | 75 days |
| Floor areas | — | not reported by the source |
| Competent authority | Auderghem |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 169 m | Demolition and reconstruction | Reconvertir 2 immeubles (n°173-174) monofonctionnels d’une superficie totale de 11 976 m² de bureau : Démolir l’immeuble | 2026 |
| 175 m | Signs and advertising | installer 2 enseignes-bannières à l'avant du bâtiment les Orangeries (maison de repos) NDL | 2021 |
| 175 m | Merger of dwellings | modifier le permis 15365 ainsi que remplacer 3 kots par une conciergerie, remplacer des tôles métalliques au rez-de-chau | 2025 |
| 189 m | Tree felling | mise en conformité, suite à un arrêté du Bourgmestre, de l'abattage de 17 arbres à haute tige | 2023 |
| 195 m | Tree felling | abattre 7 arbres à haute tige: 5 saules marsaults (dont deux morts) et 2 pins noirs (morts) | 2023 |
Other nearby cases : 09/AA/1938353, 02/PFD/1935557, 02/GOU_PU/2043076, 09/LPFD/1917130, 02/PFD/1891699
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)