Boulevard Simon Bolivar 34
Bruxelles · PU/527084 · Permis d'urbanisme privé
Boulevard Simon Bolivar 34, Bruxelles: heavy renovation. Case octroyé, lodged on 29 April 2014. The decision was notified on 18 September 2014, 142 days after lodging.
créer une porte d'accès dans la façade mur-rideau et aménager en lieu et place de salles de réunion un espace accessible au public et accessoire à la fonction de bureau| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 29 April 2014 | date the file was received |
| Decision notified | 18 September 2014 | 142 days |
| Floor areas | — | not reported by the source |
| Competent authority | Bruxelles |
Timeline
- Application lodged
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 95 m | Façade and windows | Modifier les châssis de l'entrée principale de la tour WTC III | 2022 |
| 109 m | New construction | renouveler, pour une durée maximale de 4 ans, l’installation de 13 conteneurs préfabriqués, d’une terrasse et d’une zone | 2023 |
| 109 m | New construction | Demande initiale : Construire sur une partie du site formé par l'actuel immeuble WTC III, après démolition partielle du | 2022 |
| 118 m | Heavy renovation | apporter des modifications lourdes avec modifications de volume à un immeuble de bureau | 2025 |
| 134 m | Other | Installer une œuvre d'art (Permis Modificatif du 04/PFD/688807). | 2024 |
Other nearby cases : 04/PFD/1994337, 04/PFD/1998434, 04/PFD/1822391, 04/GOU_PU/2033319, 04/PFD/2019649, 04/PFD/2020155, 04/PFD/1833092, 04/PU/2035010, 04/PU/1832245
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)