76 permit cases concern Rue Picard 3 since 2001: 21 granted, 0 refused and 4 pending. Cases are listed newest first.
| Records in total | 76 | |
|---|---|---|
| First case | 2001-10-18 | |
| Latest case | 2026-07-14 | |
| Granted | 21 | |
| Refused | 0 | |
| Net housing authorised | 28 234 m² | Granted |
The cases, newest first
| Date | Reference | Work type | Outcome | Object |
|---|---|---|---|---|
| 2026-07-14 | 04/PU/2039098 | Energy works | Pending | installer des batteries stationnaires sur le site de Tour & Taxis |
| 2026-06-16 | 04/IPEPLP/2035661 | Operation of installations | Pending | Prolongation du permis d'environnement |
| 2026-03-25 | 04/PFD/2025541 | Change of use | Pending | Changer de destination et d'utilisation une partie des bâtiments A, B et E de Tour-et-Taxis |
| 2026-03-25 | 04/IPE/2025509 | Operation of installations | Pending | T&T | Ajout des installations de Syntra et Temple Studios |
| 2026-01-27 | 04/IPE/2018090 | Operation of installations | Withdrawn | Exploitation d'un atelier de menuiserie et de travail du cuir destiné à la formation |
| 2026-01-15 | 04/CL2/2016560 | Change of use | Withdrawn | Changement d'affectation avec travaux structurels d'une partie des caves situées sous les Sheds vers un équipement (Temple Studios, hub créatif et musical) |
| 2025-12-18 | 04/IPE/2013992 | Change of use | Withdrawn | Changement d'affectation avec travaux structurels d'une partie des caves situées sous les Sheds vers un équipement (Temple Studios, hub créatif et musical) |
| 2025-08-12 | 04/PFD/1997523 | Change of use | Withdrawn | Changer de destination et d'utilisation une partie des bâtiments A, B et E de Tour-et-Taxis. |
| 2025-08-08 | 04/IPEEXT/1997302 | Operation of installations | Withdrawn | Exploitation d'un atelier de menuiserie et de travail du cuir destiné à la formation, dans les SHEDS. Ajout d’un atelier de menuiserie et d’un atelier de travail du cuir dans les SHEDS dans le cadre d’une activité de formation |
| 2025-06-26 | 04/PFD/1992358 | Change of use | Granted | Changement d'affectation avec travaux structurels d'une partie des caves situées sous les Sheds vers un équipement (Temple Studios, hub créatif et musical) |
| 2023-12-20 | 04/IPEMOD/1926891 | Operation of installations | Granted | Modification des conditions particulières relatives à la sécurité et à la prévention contre l’incendie et l’ajout de plans cachetés (obligations administratives), dans le cadre de la modification de l’accès au parking « P1 ». |
| 2023-02-02 | 04/PFD/1870968 | Change of use | Granted | Installer un centre d'entrainement pour la pratique du padel dans le shed n°4 de la zone E de Tour & Taxis. |
| 2019-11-26 | 04/IPEDEC/1733822 | — | Withdrawn | 149M1 |
| 2019-11-26 | 04/IPE/1733810 | Other | Withdrawn | 148M1&32148M1 |
| 2019-05-09 | 04/PU/1712236 | Change of use | Granted | changer une partie des sous-sol affectée au commerce en local vélos (534 emplacements) et ses compléments fonctionnels (atelier, douches, casiers, …) avec la création d’une rampe d’accès au pied de la façade Nord ; créer 2 accès piétons le long de la façade ouest (un pour le local vélos et un pour |
| 2018-09-17 | 04/IPEEXT/698839 | Operation of installations | Granted | Ajout de 2 dépôts (divers et DEEE), avec MOC |
| 2018-06-19 | 04/IPE/687663 | Operation of installations | Granted | Exploitation d’un showroom de meubles et objets de décoration destinés à la vente |
| 2018-01-05 | 04/IPEEXT/663605 | — | Withdrawn | |
| 2017-11-28 | 04/PFD/658010 | Change of use | Granted | Affecter une partie du sous-sol des « Sheds », actuellement occupés par de l’entreposage et du stock, en surfaces commerciales, avec ouverture d'un accès depuis le parking sous l’esplanade (niveau -1) et remplacement du volet d’accès au sous-sol en portes de secours en acier. |
| 2017-09-04 | 04/IPE/650289 | — | Withdrawn | SBX3500 |
| 2017-08-14 | CL3/648074 | — | Granted | werf |
| 2017-07-13 | 04/PFD/644573 | Change of use | Withdrawn | Réaffecter une partie du sous-sol des sheds en surfaces commerciales et de production. Ouvrir un accès depuis le parking sous l’esplanade (niveau -1) et changer le volet d’accès au sous-sol en portes de secours en acier. |
| 2016-08-16 | 04/IPEEXT/608507 | Operation of installations | Granted | ajout et suppression de certaines installations classées en vue de régulariser la situation de fait. |
| 2016-06-30 | 04/IPEPLP/604194 | Operation of installations | Granted | Exploitation des bâtiments Entrepôt royal et SHEDS (HVAC, salle de fêtes et transfos) et des parkings 1, 2 et 3. |
| 2016-06-20 | 04/IPE/603359 | — | Withdrawn | 99TTC_01 |
| 2015-08-24 | 04/IPE/579007 | — | Withdrawn | 99TTC |
| 2015-06-25 | 04/IPE/566249 | — | Withdrawn | 99TTC |
| 2015-04-29 | 04/IPEMOD/562981 | Operation of installations | Withdrawn | demande pour organiser noeonsplash le 1er mai |
| 2015-04-27 | 04/IPEMOD/562846 | Operation of installations | Withdrawn | organisation de l'événement Néonsplash le 30/4 jusqu'au matin 1/5 |
| 2015-04-15 | PU/562227 | Heavy renovation | Granted | modifier le permis d'urbanisme P114/2013 pour l'immeuble de bureau "Méandre" en ce qui concerne le placement d'un poteau articulé sous le porte-à-faux de la façade Sud, le retrait des volumes vitrés des jardins d'hiver des façades Est et Ouest, la suppression du rez+14 et le réaménagement des locaux |
| 2015-03-16 | 04/IPEMOD/560636 | Operation of installations | Withdrawn | god save the 90's le 10/4/2015 |
| 2015-02-20 | 04/IPE/557848 | Operation of installations | Withdrawn | Permis modification |
| 2015-01-23 | 04/IPEEXT/557298 | — | Withdrawn | |
| 2014-12-01 | PU/554200 | Public space | Granted | modifier une partie du permis d'urbanisme n° 82P/07 concernant l'aménagement du parc et aménager une partie du parc située hors ZIR |
| 2014-11-07 | 04/PFD/552767 | Other | Withdrawn | Installer temporairement, sur le terrain de Tour & Taxi, un pylône (30.00m) comportant 3 antennes et 3 faisceaux hertziens sur la toiture d'un local technique. |
| 2014-09-29 | 04/IPEMOD/549293 | Operation of installations | Withdrawn | modification du permis d’environnement pour permettre d’exploiter les sheds après deux heures du matin pour l’événement Silo programmé pour le 24/10/2014 |
| 2014-09-24 | 04/IPEMOD/548699 | Other | Withdrawn | blackout belgium |
| 2014-09-22 | 04/PFD/548501 | Other | Granted | Installer une station de télécommunication. |
| 2014-09-03 | 04/IPE/547355 | — | Withdrawn | 99TTC |
| 2014-07-24 | 04/IPEMOD/544938 | Operation of installations | Withdrawn | DJ experience |
| 2014-06-19 | 04/IPE/528770 | — | Withdrawn | 99TTC |
| 2014-06-06 | 04/IPE/528474 | — | Withdrawn | SBX3500 |
| 2014-05-19 | 04/IPEMOD/527484 | Operation of installations | Withdrawn | therapy sessions |
| 2014-04-03 | 04/IPEMOD/500335 | Other | Withdrawn | demande de dérogation pour l'événement Neonsplash Paint-Party du 30/04/2014 dans sheds 3 et 3bis |
| 2014-03-13 | 04/IPEEXT/499267 | — | Withdrawn | SBX3500 |
| 2014-03-12 | 04/IPEMOD/499291 | Operation of installations | Withdrawn | demande de modification pour l'organisation du God save the 90's le 11/04/2014 de 22h30 à 5h d&ans le shed 1. |
| 2014-03-10 | CL3/526909 | — | Granted | Chantier |
| 2014-03-04 | 04/IPEMOD/498877 | Operation of installations | Withdrawn | demande de dérogation pour l'organisation du festival Universal V Project le 12/04/2014 dans les sheds 2 et 3 de 22h à 5h00 du matin. |
| 2014-02-27 | 04/IPEMOD/498590 | Operation of installations | Withdrawn | nuit de radio 100 ans |
| 2014-02-11 | 04/IPEMOD/497746 | Other | Withdrawn | événeemnt pias nite : refus |
| 2013-10-29 | PU/526436 | New construction | Granted | modifier le permis d'urbanisme 21P/10 en ce qui concerne l'accès principal au site, l'aménagement de l'esplanade et le parking souterrain situé sous l'esplanade et construire un pavillon d'accès |
| 2013-09-23 | 04/PFD/492305 | New construction | Granted | Projet "LE MEANDRE" Projet initial : Construire un immeuble de bureaux avec parking au sous-sol, réaménager les emplacements de parking extérieurs et modifier le sous-sol de la Gare Maritime. Projet amendé : Construire un immeuble de bureaux avec parking au sous-sol, réaménager les emplacements de |
| 2013-09-09 | 04/IPEMOD/491982 | Operation of installations | Withdrawn | Notification de l’événement Neonsplash Paint-Party avec demande de modification de la limitation de l’horaire d’exploitation du site |
| 2013-09-09 | 04/IPEMOD/491981 | — | Withdrawn | reggaebus |
| 2013-08-05 | 04/IPEMOD/490636 | Operation of installations | Withdrawn | modification des conditons d'exploitation des sheds (sécurité, bruit) |
| 2013-06-21 | 04/IPETMP/488939 | — | Withdrawn | 99TTC |
| 2013-06-18 | 04/IPEEXT/488946 | — | Withdrawn | |
| 2012-08-10 | 04/IPEMOD/473505 | — | Withdrawn | |
| 2012-06-20 | 04/IPETMP/471342 | — | Withdrawn | 99TTC |
| 2011-08-30 | 04/IPE/459472 | — | Withdrawn | SBX3500 |
| 2011-08-25 | 04/IPETMP/459352 | Operation of installations | Withdrawn | 99TTC - City parade 27/08/2011 |
| 2011-06-21 | 04/IPETMP/458656 | Operation of installations | Withdrawn | 99TTC - Dossier temporaire pour l'évenement Couleur Café du 24/06/2011 au 27/06/2011 |
| 2010-09-30 | 04/PFD/286390 | Other | Withdrawn | Construire un pylône et installer une station de télécommunication temporaires (mise en conformité) |
| 2010-03-17 | 04/IPE/456399 | — | Withdrawn | |
| 2010-03-05 | PU/519750 | New construction | Granted | dans la ZIR 6B: construction d'un nouveau bâtiment de bureau (16725 m²) comprenant 8 niveaux hors-sol et 1 niveau de parkings (77) et d'archives en sous-sol, construction d'un parking enterré de 298 emplacements pour véhicules motorisés, adaptation du parking temporaire hors-sol et des accès aux par |
| 2006-10-12 | 04/IPEEXT/449354 | Operation of installations | Withdrawn | Réarrangement des 172 places du parking en plein air |
| 2005-08-12 | 04/IPE/446685 | Operation of installations | Withdrawn | extension du permis 01/0363 pour un garage parking de 297 places |
| 2005-07-12 | PU/515623 | Public space | Granted | Modification de l'emplacement des parkings extérieurs -construction d'une rampe d'accès au sous-sol du bâtiment A - démolition de deux annexes en ruine - création d'un rond-point -placement de poubelles fixes MOLOK - changement d'affectation de deux cellules de commerce en équipement - démolition |
| 2005-07-12 | PU/515622 | Change of use | Granted | modification de l'affectation du sous-sol du Bâtiment B, portant le nombre total d'emplacements de parking couvert de 195 à 297 places |
| 2005-07-12 | PU/515618 | Public space | Granted | modification de l'utilisation de l'espace en air libre, portant le nombre total d'emplacements de parking à air libre de 172 à 1019 places et élargissement à 4 bandes de circulation de la voie d'entrée sis av. du Port |
| 2005-05-17 | CL2/446105 | — | Withdrawn | |
| 2004-10-04 | PU/513146 | Change of use | Granted | Installation d'une crèche au rez du bâtiment B de Tour & Taxi / implantation d'une terrasse et d'un espace jardin ----------- ATTENTION DEUX PERMIS (1 PU pour la crèche et 1 PU à durée limitée pour les aménagements extérieurs) ----------------- |
| 2004-04-19 | 04/IPEMOD/443794 | Operation of installations | Withdrawn | Modification du débit de certains ventilateurs |
| 2004-03-29 | 04/IPEEXT/443725 | Operation of installations | Withdrawn | Modifications multiples aux IC + suppression ventilation mécanique pk |
| 2004-02-24 | 04/IPEEXT/443534 | — | Withdrawn | |
| 2001-10-18 | 04/IPE/434698 | Operation of installations | Withdrawn | exploitation d'un complexe immobilier de bureaux, de cvommercees et équipements collectifs |
This street carries 183 cases in Bruxelles, across every address.
A case belongs to this address when the source records the same number, street and commune. Works carried out without a permit, or exempt from one, do not appear here.